This project involved reconfiguring an existing substation, with the removal of three existing 22kV transformers, all the existing poles and associated overhead aerial cabling. Works included the installation and commissioning of new Schneider RM6 RMU cubicles, associated HV feeder cable configuration to a new 2MVA transformer and 1.5MVA transformer, re-configuring of low voltage cabling. This installation is suitable for REFCL service.

Services: substation design, equipment installation, high voltage cable jointing & termination, earthing systems, testing and commissioning, compliance